0
Crores (in INR)

Project Specifications
  • The works include the construction of water inlet and outlet transitions, a 4.06 km-long canal, and a 5.2 km tunnel for carrying water from the barrage to the tunnel, along with the construction of a head regulator, super passages, and village bridges